Is your hydrogen project ready for RFNBO certification?
Answer a few questions to see where your project stands and what to check next.
How to use this check
A planning aid for electrolytic hydrogen intended for EU RFNBO markets, including imported hydrogen.
What does the result mean?
“Core design checks look aligned” means the declared inputs meet the checks screened here. Unanswered questions lead to review actions. Gaps lead to specific changes to the supply or operating plan. A failed pathway does not rule out another pathway or a qualifying portion of production.
This screen checks the core project design: renewable supply coverage, generator eligibility, location and timing for grid procurement, direct-supply separation where relevant, and full fuel emissions. It uses ordinary commissioning dates and the standard grid route. It does not certify evidence, calculate an hourly dispatch profile, or determine the qualifying RFNBO production percentage. Added capacity, repowering, special grid exemptions and national measures need separate confirmation.
What about dates, storage and exceptions?
The additionality transition and time matching are separate. Early operation does not defer hourly matching. This screen checks ordinary commissioning dates; repowering, replacement PPAs and capacity extensions with special treatment go to specialist review. Electricity storage and the day-ahead price exception also need interval-level evidence. Hydrogen storage does not establish electricity matching.
Grid data and RFNBO evidence
Country statistics show the national electricity mix and generation emissions. They do not use the same boundaries as every RFNBO test: imports, losses, geographical coverage and historical periods can differ. A qualifying renewable-share ratio can also exceed 100%, whereas a generation share is a different metric. Obtain accepted bidding-zone calculations before using an exemption. The reference dataset never changes a screening result by itself.
Sources and rule maintenance
Based on the supplied “RFNBO Hydrogen Explained” article and the primary rules below. Review date: October 2026. Future years are scenarios using these rules, not predictions of future law. Confirm applicable national measures and certification-scheme guidance before relying on a result.